Skip to content
Hospitality
02

Hospitality

The hotel design is one of the key factors on the way to success. Many tourists decide whether to stay at this hotel by looking at pictures of rooms and halls. At the same time, it is necessary to create a hotel interior that is quite unique to stand out among similar, but not too flashy, as there will be thousands of guests with different tastes, and everyone must be satisfied. Delighted guests want to show their friends and the world where they have stayed, so the hotel’s modern design is free social advertising for business.

Stages of work

Preparatory work
01
05
Preparatory work

Our specialists come to your location, carry out measurements, collect initial information on the premises, including general data on engineering systems, find out the requirements of the owner of the premises. Evaluate the possibility of making structural changes to the premises, identify its features and bottlenecks. They will interview you to identify the needs and wishes, requirements of the brand book and the operator.

Planning and concept creation
02
05
Planning and concept creation

Based on the collected data, our architects and designers develop an individual functional and rational planning solution, taking into account the requirements of the brand book, the operator, the needs of the given location, technology, and applicable rules and regulations. The concept-moodboard- is created together with the planning solution from existing references and prototypes and shows the direction and atmosphere of the design of the future hotel.

Create visualization
03
05
Create visualization

After the concept is approved, our team creates a photorealistic 3-D visualization, on which you can see how your hotel will look after completion of construction work. Also, visualization allows you to acquaint your guests and partners with the hotel and its room stock even before the completion of construction.

Preparation of working drawings
04
05
Preparation of working drawings

After the approval of the previous stages, the development, verification and transfer of working architectural and engineering drawings necessary for the implementation of construction work follows. The developed drawings include not only technical documentation, but also the selection of all finishing materials, furniture and equipment, indicating the brand/model/article number. For custom-made furniture, drawings are developed for implementation. If necessary, we coordinate the project with the operating company or the owner of the premises.

Education institutions' interior design 1
05
05
Designer supervision

Directly during construction work, the leading architects of our company regularly come to the location and monitor the work of contractors for compliance with the work performed according to drawings, visualizations, and also solve non-standard situations so that at the exit you get the interior and exterior that you saw on the visualization.

Contact us to discuss the details