Skip to content
Interior design of medical centers
07

Interior design of medical centers

The interior design of medical centers influences a personal’s physical condition, since not only a person’s internal condition but also his or her health depends on the environment. When patients see concrete walls and dark corridors, they feel as helpless as possible in such place. The task of modern interior design of a medical institution is to create the most comfortable atmosphere for the patient, which will help them recover faster.

Stages of work

Preparatory work
01
05
Preparatory work

Our specialists come to your location, carry out measurements, collect initial information on the premises, including general data on engineering systems, the requirements of the premises owner. Evaluate the possibility of making structural changes to the premises, identify its features and bottlenecks. They will interview you to identify the needs and wishes, requirements of the brand book.

Planning and concept creation
02
05
Planning and concept creation

On the basis of the collected data, our architects and designers develop an individual functional planning solution, taking into account the characteristics of the premises, the focus of the center, the list of services provided, and their technological features, applicable rules and regulations. Concept-moodboard - created together with a planning solution from existing references and prototypes and shows the direction and atmosphere of the design of the future center.

Create visualization
03
05
Create visualization

After the concept is approved, our team creates a photorealistic 3-D visualization, on which you can see how your center will look after the completion of construction work, and makes it possible to present the idea to your partners.

Preparation of working drawings
04
05
Preparation of working drawings

After the approval of the previous stages, the development, verification and transfer of working architectural and engineering drawings necessary for the implementation of construction work follows. The developed drawings include not only technical documentation, but also the selection of all finishing materials, furniture, etc. equipment indicating the brand / model / article. For custom-made furniture and equipment, drawings are developed for implementation. If necessary, we coordinate the project with the operating company or the owner of the premises.

Education institutions' interior design 1
05
05
Designer supervision

Directly during construction work, the leading architects of our company regularly come to the location and monitor the work of contractors for compliance with the work performed according to drawings, visualizations, and also solve non-standard situations so that at the exit you get the interior that you saw on the visualization.

Contact us to discuss the details